{"id":331,"date":"2026-04-22T18:21:47","date_gmt":"2026-04-22T18:21:47","guid":{"rendered":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/?p=331"},"modified":"2026-04-29T17:42:54","modified_gmt":"2026-04-29T17:42:54","slug":"week-11-mar-30-apr-5-soft-opening-production-phase","status":"publish","type":"post","link":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/week-11-mar-30-apr-5-soft-opening-production-phase\/","title":{"rendered":"Week 11 (Mar 30 \u2013 Apr 5) \u2014 Soft Opening Production Phase"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"828\" height=\"402\" src=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-6.png\" alt=\"\" class=\"wp-image-379\" srcset=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-6.png 828w, https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-6-300x146.png 300w, https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-6-768x373.png 768w\" sizes=\"auto, (max-width: 828px) 100vw, 828px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"829\" height=\"603\" src=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-7.png\" alt=\"\" class=\"wp-image-380\" srcset=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-7.png 829w, https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-7-300x218.png 300w, https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-7-768x559.png 768w\" sizes=\"auto, (max-width: 829px) 100vw, 829px\" \/><\/figure>\n\n\n\n<p>This week focused on <strong>implementing improvements based on playtest feedback<\/strong> and preparing for the Soft Opening.<\/p>\n\n\n\n<p>The team worked through a structured task plan derived from the previous week\u2019s feedback, dividing responsibilities across disciplines.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Key Progress<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Addressed core issues identified during playtesting<\/li>\n\n\n\n<li>Improved <strong>gameplay clarity and flow<\/strong><\/li>\n\n\n\n<li>Continued building toward a <strong>stable Soft Opening build<\/strong><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What Changed From Last Week<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transitioned from <strong>feedback collection \u2192 targeted iteration<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Development became more <strong>structured and priority-driven<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"488\" height=\"763\" src=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-5.png\" alt=\"\" class=\"wp-image-378\" srcset=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-5.png 488w, https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-5-192x300.png 192w\" sizes=\"auto, (max-width: 488px) 100vw, 488px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"618\" height=\"511\" src=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-8.png\" alt=\"\" class=\"wp-image-382\" srcset=\"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-8.png 618w, https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-content\/uploads\/2026\/04\/image-8-300x248.png 300w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>This week focused on implementing improvements based on playtest feedback and preparing for the Soft Opening. The team worked through a structured task plan derived from the previous week\u2019s feedback, dividing responsibilities across disciplines. Key Progress What Changed From Last Week Development became more structured and priority-driven<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-331","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/posts\/331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/comments?post=331"}],"version-history":[{"count":3,"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/posts\/331\/revisions"}],"predecessor-version":[{"id":383,"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/posts\/331\/revisions\/383"}],"wp:attachment":[{"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/media?parent=331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/categories?post=331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.etc.cmu.edu\/grey-waves-studio\/wp-json\/wp\/v2\/tags?post=331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}