Week 15 4/22 – 4/26
Installation
This week, Angie put the final touches on the installation. She moved the media screen closer to the guest, as well as moved the fresnel closer as well, to hide the edges of the frames better. She also was unable to install the raindrops on the window, so it will not be ready for the final. With all the elements together and cleaned up, the installation was ready to show Deeplocal.
Client Meeting
We presented our work to Deeplocal in person this week. They visited the ETC at the end of the week. They liked the work we made and thought it was cool! They gave us some good feedback about the product and what we could do to make it even better if we had more time. Regardless, they were impressed with our work and it was great getting to meet in person for our final meeting.
Trailer
This week, Anna has revised the shortlists with Mo and scheduled with Regina for shooting on Friday. Cassie brought the camera and did the shooting for both indoor and outdoor scenes, with the help of Anna, Angie, and Yawen. After Cassie handed the clips to Anna, Anna started to edit the first draft.
Programming
This week, Annie finished the two whole songs with parameterization. She made a few adjustments to the scenes to tailor each song. She did other versions of the two songs for the trailer, changing the rain time and brightness of the environment.
Art
Kira added two hero assets to the city scene.
Production
This week, Yawen worked on the final presentation structure, designed the logo of the product Blue View, and also designed the deck template. She also worked on communicating with the faculties to finalize the project.