We do think we make a pretty good job and a pretty solid product! This week […]
Toward the end of the semester, we set up a second playtesting with Lincoln Elementary School, […]
These two weeks, we did some final polishing and have all product done! Playtest: We plan […]
This week, we kept polishing and iterating our product. Playtest: We have the first playtesting with […]
This week, we kept working on indoor and on-site part, and made a lot of progress […]
This week, we put all our efforts into designing and testing the on-site part. Art and […]
This semester passed so fast, this week we did our ½ presentation in RPIS. We divide […]
This week, we tried our best to work on two playtesting slots this Friday. Art and […]
This week we had an Demo! Design: We moved further with the two experience designs. For […]