Week2

Jan 23 – 29

Summary:

Our clients Brad and Bobby from EKTO VR visited us and we had EKTO ONE deployed at ETC. The team finished setting up the rest of our workspaces: the platform room and the meeting room. We excelled in brainstorming and refining ideas with the goal to lock down initial design ideas after 1/4 walkaround.

Production:

As well as physical workspaces were organized, our virtual workspaces including the official team folder, shared google drive, and slack space with our clients got launched. The overall timeline and rough milestones were set internally and documented with the Google Sheet.

Overall team branding already got its unique shape as the logo and poster were created by Yutian (Ray) and Abhi!

Design:

Preparing the upcoming 1/4 walkaround with ETC faculty, we worked on a rough draft of the presentation. Our adviser John gave us constructive feedbacks which helped us a lot to clarify the highlights of each idea and develop them.