Having Soft Opening on Monday, we have received a lot of feedback from the faculty. With help from the faulty, we built the complete game flow with the alternative controller and installed the environment in the project room. We are getting prepared for the showcase in the festival as it’s getting closer and closer.

Installation of the game

We have set up a space for the guests to experience our game with touch frame and touchscreen.

Lighting effects greatly helped build the atmosphere that suits our game and theme.

Programming

Tested game in team and outside team.

Fixed bugs in the game.

Production

Presented the game to the faculty and scribed feedback during Soft Opening.

Purchased props and sent requirements of borrowing hardware from ETC.

Plans for next week

Finish decorating the space for the festival.

Get prepared for the festival, including space installation, bug fix, and renewing UI.